List of Bentley RAM Structural System Customers
Exton, 19341, PA,
United States
Since 2010, our global team of researchers has been studying Bentley RAM Structural System customers around the world, aggregating massive amounts of data points that form the basis of our forecast assumptions and perhaps the rise and fall of certain vendors and their products on a quarterly basis.
Each quarter our research team identifies companies that have purchased Bentley RAM Structural System for 3D Modeling from public (Press Releases, Customer References, Testimonials, Case Studies and Success Stories) and proprietary sources, including the customer size, industry, location, implementation status, partner involvement, LOB Key Stakeholders and related IT decision-makers contact details.
Companies using Bentley RAM Structural System for 3D Modeling include: WSP UK, a United Kingdom based Professional Services organisation with 9000 employees and revenues of $1.14 billion, McGee Group Limited, a United Kingdom based Construction and Real Estate organisation with 500 employees and revenues of $150.0 million, Wallace Design Collective, a United States based Professional Services organisation with 250 employees and revenues of $45.0 million and many others.
Contact us if you need a completed and verified list of companies using Bentley RAM Structural System, including the breakdown by industry (21 Verticals), Geography (Region, Country, State, City), Company Size (Revenue, Employees, Asset) and related IT Decision Makers, Key Stakeholders, business and technology executives responsible for the software purchases.
The Bentley RAM Structural System customer wins are being incorporated in our Enterprise Applications Buyer Insight and Technographics Customer Database which has over 100 data fields that detail company usage of software systems and their digital transformation initiatives. Apps Run The World wants to become your No. 1 technographic data source!
Apply Filters For Customers
| Logo | Customer | Industry | Empl. | Revenue | Country | Vendor | Application | Category | When | SI | Insight | Insight Source |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
McGee Group Limited | Construction and Real Estate | 500 | $150M | United Kingdom | Bentley Systems | Bentley RAM Structural System | 3D Modeling | 2019 | n/a | In 2019 McGee Group Limited supported the Admiralty Arch Waldorf Astoria basement works where project teams led by WSP leveraged Bentley RAM Structural System within 3D Modeling workflows to resolve complex substructure geometry and load paths. Bentley and WSP project materials list McGee as a project stakeholder and reference the use of Bentley RAM and PLAXIS, and McGee's direct use of Bentley RAM Structural System for the project is inferred from those materials. Within the 3D Modeling context Bentley RAM Structural System would have been applied for structural frame modeling, load combination analysis, design checks and automated report generation to accelerate basement design iterations. Workflows likely focused on integrating frame analysis outputs into coordinated drawing deliverables and producing design calculation packages aligned with substructure engineering and delivery practices. The project references PLAXIS for geotechnical modeling, indicating coordinated geotechnical and structural modeling workflows across stakeholders rather than isolated analysis. The implementation scope was project level, centered on McGee substructure engineering and construction delivery teams collaborating with WSP for design coordination and constructability reviews. Governance followed Bentley-centric project workflows as referenced by stakeholders, emphasizing model-led coordination between structural and geotechnical specialists and standardized report outputs for approvals. Project materials report approximately 25% reduced design time attributed to the Bentley workflows, this reported outcome is specific to the Admiralty Arch basement engagement and tied to the Bentley RAM Structural System cited in source documents, and McGee module usage is described here as inferred from stakeholder materials rather than formally documented by the vendor. | |
|
|
Wallace Design Collective | Professional Services | 250 | $45M | United States | Bentley Systems | Bentley RAM Structural System | 3D Modeling | 2022 | n/a | In 2022, Wallace Design Collective implemented Bentley RAM Structural System to support its structural engineering workflows. The deployment is documented on Bentley's RAM Concept vendor page where Dan Popp, Principal at Wallace Design Collective, is quoted endorsing RAM Concept for post-tensioned and reinforced concrete slab design, confirming use of Bentley RAM Structural System in 3D Modeling for structural slab and foundation engineering in the United States. The implementation specifically centers on the RAM Concept module within Bentley RAM Structural System for post-tensioned slab analysis, reinforced concrete slab design, and foundation engineering tasks, reflecting core 3D Modeling capabilities such as finite element slab modeling, reinforcement layout, and design-to-document workflows. Operational scope is focused on Wallace Design Collective's structural engineering practice in the United States, and the vendor-side practitioner quote by Dan Popp is the primary source reporting module-level usage. | |
|
|
WSP UK | Professional Services | 9000 | $1.1B | United Kingdom | Bentley Systems | Bentley RAM Structural System | 3D Modeling | 2023 | n/a | In 2023, WSP UK applied the Bentley RAM Structural System as a core 3D Modeling tool during a structural engineering and design engagement for Unity Place, the Santander UK headquarters. The engagement used Bentley RAM Structural System together with PLAXIS to drive engineering decisions, and the work is described as a structural engineering and design engagement in the United Kingdom that generated time, cost, and carbon savings. WSP UK used Bentley RAM Structural System including the RAM Concept component to model, analyze, and optimize frame, slab, and foundation elements, leveraging standard 3D Modeling capabilities for iterative design refinement. The Bentley RAM Structural System supported parametric and load-based design workflows typical of structural analysis, enabling repeated design scenarios to reduce material quantities while preserving structural performance. The Bentley RAM Structural System was used in integrated workflows with PLAXIS for geotechnical analysis, linking soil-structure interaction inputs into the 3D Modeling and structural analysis process. Operational coverage focused on WSP UK structural engineering and design teams working on the Unity Place project in the United Kingdom, coordinating model exchanges and design iteration cycles between structural and geotechnical roles. Governance emphasized coordinated workflows between structural and geotechnical teams and the use of Bentley RAM Structural System as the authoritative modeling environment for structural deliverables. As cited in the project case study, the combined use of Bentley RAM Structural System and PLAXIS contributed to a reduction in concrete use estimated at 16,000 tonnes and a significant lowering of embodied carbon, while delivering the time, cost, and carbon savings reported by the engagement. |
Buyer Intent: Companies Evaluating Bentley RAM Structural System
Discover Software Buyers actively Evaluating Enterprise Applications
| Logo | Company | Industry | Employees | Revenue | Country | Evaluated | ||
|---|---|---|---|---|---|---|---|---|
| No data found | ||||||||